Sanyo Big PACi 18 Series Technical Data & Service Manual page 138

Big pack i dc inverter
Table of Contents

Advertisement

1
Reference diagram for snow-proof duct - 1
Space requirements for setting - (1)
The models of SPW-C706 / 906VH8 with STK-BDV160E
[Obstacle to the rear of unit]
Top is open:
(1) Single-unit installation
(3) Multiple-unit installation (2 or more units)
Min. E
or more
Min. F
or more
Outdoor unit
SPW-C706 / 906VH8
Notes: 1. In cases 2 and 3 the height of the obstacle
must be no taller than the height of the outdoor
unit.
2. The amount of space required for removing the
screw on the rear of the unit.
If in case the sufficient space for maintenance is
ensured on the rear of the outdoor unit,
installation is possible with the space of both
sides of not less than 150mm where marked
with * mark.
Top is blocked by an obstacle:
(Both sides are open)
Outdoor unit
SPW-C706 / 906VH8
(2) Obstacles on both sides
Min. B
or more
Min. C
or more
Min. E
Min. E
or more
or more
A
B
C
D
E
F
150 150
250*
200
250* 150
Min. L
or more
K
L
500
150
[Obstacle to the front of unit]
Top is open:
(1) Single-unit installation
(2) Multiple-unit installation (2 or more units)
Min. I
or more
Outdoor unit
SPW-C706 / 906VH8
Note: The amount of space required for removing
G
the screw on the rear of the unit.
200
If in case the sufficient space for
maintenance is ensured on the rear of the
outdoor unit, installation is possible with the
space of both sides of not less than 150mm
where marked with * mark.
Top is blocked by an obstacle:
(Both sides are open)
Min. M
or more
Outdoor unit
SPW-C706 / 906VH8
1-133
Unit: mm
Min. I
or more
H
I
J
500
250* 1000
M
N
500
300
1

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents