Step 4 -Wiring Diagrams; Step 5 -Troubleshooting - Payne PG8J Installation Instructions Manual

Single-stage deluxe induced-combustion 4-way multipoise furnace
Table of Contents

Advertisement

continue running the blower motor at HEAT speed after
the selected blower- -OFF delay period is completed.
Step 4 —Wiring Diagrams
Refer to Fig. 24 and 45 for wiring diagrams.
Step 5 —Troubleshooting
Refer to the service label. (See Fig. 50–Service Label.)
The Troubleshooting Guide can be a useful tool in isolating
furnace operation problems. Beginning with the word Start,
answer each question and follow the appropriate arrow to the next
item.
The Guide will help to identify the problem or failed component.
After replacing any component, verify correct operation
sequence.
50

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pg8m

Table of Contents