COMPLETING THE INSTALLATION

To complete the installation and system checkout requirements, the following steps must be performed.
A. Check the room air thermistor position. Make sure the room air thermistor is routed through the holding guide and
is not touching any metal surface.
B. Refer to p. 7, and check the COMPRESSOR DELAY function. (default: NO)
C. Refer to p.19, and remove the air filters by pulling them.
D. Secure the grille to the panel with 4 screws.
E. Reinstall the air filters.
F. Turn on the power supply to the roof top air conditioner.
9
Connect the power line to the black, white and
ground wires found in the junction box using three
wire connectors. CAUTION - Connect black wire
to black wire, white wire to white wire and ground
wire to ground wire. (green to bare copper) Us-
ing UL approved electrician's tape, secure the
wire connectors in a workmanlike manner. See
Figure 11.
10
Figure 11
Tighten the strain relief clamp to secure the
supply wire. DO NOT OVERTIGHTEN. See Fig-
ure 12. Reinstall electric control box cover.
'
OWNER
S GUIDE -
17
Figure 12