Lennox G51MP SERIES Installation Instructions Manual page 23

G51mp series gas units
Hide thumbs Also See for G51MP SERIES:
Table of Contents

Advertisement

PLUG
(Must be
glued in
place)
1 − Use field−provided materials and the factory−provided
air intake screen to route the intake piping as shown in
figures 27 and 28. Maintain a minimum clearance of 3"
(76mm) around the air intake opening. The air intake
opening (with the protective screen) should always be
directed either downward or straight out. Use 2" pipe
and fittings only and make sure that the air intake does
not extend more than 6" beyond the G51MP cabinet.
The air intake connector must not be located near
the floor. To avoid this complication in downflow
applications which do not include a downflow
evaporator coil, the intake air routing should be modi-
fied as shown in figure 28.
TYPICAL AIR INTAKE PIPE CONNECTIONS
DOWNFLOW NON−DIRECT VENT APPLICATIONS
(Right−Hand Exit in Downflow Applications Shown)
6 in. Max.
INTAKE DEBRIS
SCREEN
(Provided)
Downflow
Evaporator
NOTE − Debris screen and sweep ell may be rotated, so that
Coil
screen may be positioned to face forward, backward or to the side.
FIGURE 28
Page 23
PLUG
(Must be
glued in
place)
2 − Use a sheet metal screw to secure the intake pipe to the
connector, if desired. A pilot indentation is provided in the
slip connector to assist in locating and starting the fasten-
er.
3 − Glue the provided 2" ABS plug into the unused ABS air
intake connector on the opposite side of the cabinet with
ABS or all purpose solvent cement.
2" SWEEP
ELL
INTAKE
DEBRIS
SCREEN
(Provided)
2"
18 in.
2" SWEEP ELL
Downflow Additive Flloor Base

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents