Wiring Connection - LG ATNH126ELFB Service Manual

Universal system air conditioner
Hide thumbs Also See for ATNH126ELFB:
Table of Contents

Advertisement

Hanging bolt
(W3/8 or M10)
Nut
(W3/8 or M10)
Spring washer
(M10)
• The following parts are local purchasing.
Hanging Bolt
- W 3/8 or M10
Nut
- W 3/8 or M10
Spring Washer - M10
Plate Washer - M10

8.3 Wiring Connection

• Open the control box cover and connect the remote control cord and Indoor power wires.
Indoor
power cord
Remote
controller
cord
Terminal Block in Indoor
1(L)
Connected to outdoor unit
WARNING
Make sure that the screws of the terminal are free from looseness.
Keep the length of the bolt
from the bracket to 40mm
Flat washer for M10
(accessory)
Flat washer for M10
(accessory)
Nut
(W3/8 or M10)
2(N)
3
4
Air Conditioner body
Ceiling board
Paper pattern
for installation
Adjust the same height
CAUTION
• Tighten the nut and bolt to prevent unit from
falling off.
Control box cover
Control box cover
fitting screw(2 units)
Ceiling Cassette 4-way
Ceiling
Ceiling board
Set screw of
paper pattern (4 pieces)
Open the ceiling board
along the outer edge of the
paper pattern.
[Air inlet side view]
Service Manual 31

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents