4
DOUBLE SWING BAROMETRIC DRAFT
CONTROL INSTALLED ON HORIZONTAL
CONNECTOR
DO NOT INSTALL DRAFT REGULATOR HERE
DRILL 1/4" HOLE TO MEASURE
DRAFT,SMOKE,CO % AND STACK
2
TEMPERATURE
BOILER
Figure 2. Barometric Draft Regulator Location
Sufficient space shall be left clear around the boiler.
Do not stack items on or box in the appliance within
the required clearances to combustibles.
The figures stated in inches in the drawing below are
the minimum recommended dimensions for providing
easy access around the boiler.
EC-10
7/8
33
Boiler
A (in)
EC-13
22
EC-14
27
EC-15
32
EC-16
37
PITCH UP
1/4" PER
LINEAR FOOT
9"
FIGURE 3. BAROMETRIC DRAFT REGULATOR LOCATION
1 /4
1 /4
1 /4
1 /4
18"
18"
MINIMUM
MINIMUM
EUTE TI
PITCH UP
1/4" PER LINEAR FOOT
DO NOT INSTALL DRAFT REGULATOR HERE
BAROMETRIC DRAFT CONTROL
INSTALLED ON VERTICAL RISE
DRILL 1/4" HOLE TO MEASURE
DRAFT,SMOKE,CO % AND STACK
2
TEMPERATURE
BOILER
9"
E -10