Connections
Venting Requirements

Venting option #2 (Category III)

The Vitorond 200 boiler is a Category III positive pressure
non-condensing boiler. Each boiler must be vented
individually.
The vent system must be properly designed and suitable
materials must be selected. The chimney must be gas
tight.
Use an AL29-4C® special stainless steel venting system
(UL/ULC listed for Category III) for single-wall vertical
venting of the Vitorond 200 boiler.
For more details on the positive pressure venting option,
see the Viessmann installation instructions for the positive
pressure venting system.
IMPORTANT
The flue size outlet on the boiler does not automatically
determine the horizontal breeching, or the actual chimney
diameter.
The chimney size must be designed for the actual boiler
model and its respective input.

Flue Gas Connection

24
(continued)
Vitorond 200, VD2 Series 320 to 1080 Installation
The following manufacturers may be contacted for
suitable stainless steel chimneys:

ProTech Systems Inc.

26 Gansevoort Street
Albany, NY 12202
Tel.: (518) 463-7284
Fax: (518) 463-5271
Toll free: 1-800-766-3473

Selkirk Metalbestos

Selkirk Canada Corporation - head office
375 Green Road
Stoney Creek, ON L8E 4A5
Tel.: (905) 662-6600
Fax: (905) 662-5352
Toll free:1-800-263-9308

Security Chimneys

Division of Security Chimneys Ltd.
2125 Monterey
Laval, PQ H7L 3T6
Tel.: (450) 973-9999
Fax: (450) 973-2222
Toll free:1-800-667-3387
Please refer to the Positive Pressure Venting
System Installation Instructions.

Flue gas test point location

1. Connect the flue outlet with the shortest possible
run and with a slight upward slope to the chimney
stack. Avoid sharp bends in the flue path.
Flue outlet.......................outside Ø 12 in. (300 mm)
2. Create a flue gas test point by drilling a b in. (10 mm)
hole on the side of the vent pipe approximately two
to three times the vent pipe diameter away from the
flue gas collar of the boiler.
3. Seal and insulate the vent pipe.