Standard Equipment; Number Of Cast Iron Sections Per Model - Viessmann VD2-320 Installation Instructions Manual

Vd2 series oil-/gas-fired boiler
Hide thumbs Also See for VD2-320:
Table of Contents

Advertisement

Set-up

Standard Equipment

Boiler front
Legend
A Combustion chamber door
B Front section
C Intermediate section
D Rear section
E Flue gas collar

Number of cast iron sections per model

Boiler model VD2-
320
Total number of
sections
Number of
intermediate
sections
12
380
440
9
10
11
7
8
9
Vitorond 200, VD2 Series 320 to 1080 Installation
All necessary parts to assemble the heating boiler are
packaged and shipped in the carton labeled "Boiler
Accessories".
The heat exchanger block consists of a rear section with
mounted flue gas collar, a front section with mounted
combustion chamber door, and depending on the size
of the boiler, the appropriate number of intermediate
sections.
Individual cast iron sections are sealed by inserting
glass fiber rope gaskets which are glued into the pre-
cast groove system on each section to seal the flue gas
passageways.
The water side seal between the sections is achieved with
cast iron push nipples.
IMPORTANT
Observe directional arrows on cast iron sections. See Fig.
3, as well as step 7 on the following page.
500
560
630
12
13
14
10
11
12
700
780
860
15
16
17
13
14
15
950
1080
18
19
16
17

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents