Step 2, Install Mounting Brackets; Step 3, Install The Hood - GE Monogram ZV750 Installation Instructions Manual

36” vent hood
Hide thumbs Also See for Monogram ZV750:
Table of Contents

Advertisement

Available languages

Available languages

INSTALLATION – VENTED TO THE OUTSIDE
INSTALL MOUNTING BRACKETS
The vent hood must be secured to rear support framing
or a wall stud.
• With the template taped in place, use a punch to mark all
mounting screw locations.
• Drill 1/8 pilot holes at the 6 punched locations.
• Remove the template.
• Enlarge holes that did not enter studs to 3/8 and tap
anchors for wall fasteners into the holes.
– Drive screws into the fasteners to allow anchors to
expand against the wall material. Remove the screws
for final installation.
• Secure the mounting brackets to the wall studs with
wood screws provided.
3 INSTALL THE HOOD
Place the hood on the brackets and slide left to right to align
with rectangular slots at the top.
• Adjust the installation height by tightening or loosening the
screws "A" at the bottom of the brackets.
• Align the hood lower mounting holes with pilot holes in
the wall.
• Using two large washers (supplied), install wood screws or
wall-fastener screws, loosely, into lower mounting holes.
Do not tighten.
• Level the hood by tightening or loosening the screws "A"
located on the bottom mounting brackets.
• Tighten the lower mounting screws.
• Tighten screws "B" located at the top of the mounting
bracket against the hood to adjust position. Do not
overtighten screws.
Installation Instructions
10
Screws "B"
Screws "A"
NOTE: Screws "A" and "B" are preassembled onto the
brackets. Do not remove these screws.
Screws "B" to adjust
hood against wall
Lower mounting
screws
Level and
height
adjustment
screws "A"

Advertisement

Table of Contents
loading

This manual is also suitable for:

Monogram zv755

Table of Contents