Installation Preparation; Tools And Materials Required; Remove The Packaging - Monogram ZV48T Installation Instructions Manual

30", 36" and 48" professional vent hoods
Table of Contents

Advertisement

TOOLS AND MATERIALS REQUIRED

(NOT SUPPLIED)
Duct tape
Pencil and tape measure
Spirit level
Pliers
Metal Snips

REMOVE THE PACKAGING

• Lift out the wooden crossmember, as well as the top
protective carton.
• Remove the protection moldings around the smaller
carton box.
• Remove the small box housing the motor.
• Lift the hood out of the box.
CAUTION
the outside edges of the inlet opening of the hood.
damage will occur!
49-80151-8

Installation Preparation

Wire cutter/
stripper
Safety glasses
Step ladder
Saber saw
or Sawsall
Lift the hood by grasping
Hammer
Key Hole Saw
Wire nuts
Flashlight
120V 60Hz. 15 or 20 Amp,
2-wire with ground. Properly
grounded branch circuit.
Wood
Mounting
Support
Motor
• Remove the shipping screws holding the wood
mounting piece to the back side of the hood.
Set aside the wood mounting piece and screws
for later installation. Do not discard.
• Remove the "V" shaped carton insert.
• Remove the parts package from the "V" shaped
cardboard insert.
• Remove the junction box cover and knockout.
• Install the strain relief onto the back or top of the hood.
• Remove all tape and packing material from the hood, duct
transition and motor.
Electric or battery operated
drill and 1/8", 3/8" bits
10" round
metal duct,
length to
suit installation.
blade screwdrivers
Strain relief for
junction cover.
Hood
Parts
Package
Shipping Carton
9

Advertisement

Table of Contents
loading

This manual is also suitable for:

Zv48sZv36tZv36sZv30tZv30s

Table of Contents