Tools And Materials Required; Remove The Packaging; Installation Preparation - Monogram ZV48T Installation Instructions Manual

30", 36" and 48" professional vent hoods
Table of Contents

Advertisement

TOOLS AND MATERIALS REQUIRED

(NOT SUPPLIED)
Duct tape
Duct Tape
Pencil and tape measure
Wire Cutter/Stripper
Spirit level
Level 2
Pliers
Metal Snips
Metal Snips
Pliers

REMOVE THE PACKAGING

• Lift out the wooden crossmember, as well as the top pro-
tective carton.
• Lift out the four "L" shaped polystyrene protection profiles.
• Remove the protection moldings around the smaller car-
ton box.
• Remove the small box housing the motor.
• Lift the hood out of the box.
CAUTION:
Lift the hood by grasping
the outside edges of the inlet opening of the hood.
Do not lift the hood by the exhaust opening divider—
damage will occur!

Installation Preparation

Wire cutter/
stripper
Safety glasses
Safety Glasses
Step ladder
Saber saw
Ladder
or Sawsall
Saber Saw
Hammer
Key Hole Saw
Key Hole Saw
Wire nuts
Wire Nuts
Flashlight
Wood
Electrical Cable
Mounting
Support
• Remove the shipping screws holding the wood
mounting piece to the back side of the hood.
Set aside the wood mounting piece and screws
for later installation. Do not discard.
• Remove the "V" shaped carton insert.
• Remove the parts package from the "V" shaped
cardboard insert.
• Remove the junction box cover and knockout.
• Install the strain relief onto the back or top of the hood.
• Remove all tape and packing material from the hood, duct
transition and motor.
8
Electric or battery operated
drill and 1/8", 3/8" bits
10" round
762Dia5
metal duct,
length to
suit installation.
Phillips and flat
blade screwdrivers
120V 60Hz. 15 or 20 Amp,
2-wire with ground. Properly
grounded branch circuit.
Hood
Parts
Motor
Package
Shipping Carton
Strain relief for
junction cover.

Advertisement

Table of Contents
loading

This manual is also suitable for:

Zv48sZv36tZv36sZv30tZv30s

Table of Contents