Download Print this page

Installing The Dell Readyrails System - Dell Networking N4000 Series Getting Started Manual

Highly scalable, non-stop networking switches for campus aggregation and core switching 10 gbe deployments
Hide thumbs Also See for Networking N4000 Series:

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 1

Installing the Dell ReadyRails System

The ReadyRails rack mounting system is provided to easily configure your
rack for installation of your switch. The ReadyRails system can be installed
using the 1U tool-less method or one of three possible 1U tooled methods
(two-post flush mount, two-post center mount, or four-post threaded).
1U Tool-less Configuration (Four-post Square Hole or Unthreaded Round Hole)
1 With the ReadyRails flange ears facing outward, place one rail between the
left and right vertical posts. Align and seat the rear flange rail pegs in the
rear vertical post flange. In Figure 3, item 1 and its extractions illustrate
how the pegs appear in both the square and unthreaded round holes.
Figure 3. 1U Tool-less Configuration
2 Align and seat the front flange pegs in the holes on the front side of the
vertical post. See Figure 3, item 2.
3 Repeat this procedure for the second rail.
4 To remove each rail, pull on the latch release button on each flange ear and
unseat each rail. See Figure 3, item 3.
Installation
15

Hide quick links:

Advertisement

loading