Chapter 5. Peripheral Equipment
Figure S-10. Cable punch-out phte
3. Mount the PFU on the wall using the three screws provided with the unit.
.
4. Connect
5. Connect the SLTs to the AEC extension ports on the PFU.
6. Connect the trunks from the DBS to the PFU.
7. Connect the AEC ports from the DBS to the PFU.
8. Connect the +24V and GND terminals from CN2 on the DBS Connector
9. Install the cover on the PFU.
5-20
j
(See Figure 5- 11.
the
trunks from the central office to the PFU.
When a power failure occurs, AEC "A" is switched to Trunk "A," AEC
Panel to the PFU.
DBS Manual - Issued 8/l/95
Section 300~Installation
DBS-70-300