Dual Battery Installation with Pre-Fuse Box and Customer Connection Points
E74475
Item
1
Pre-Fuse Box
2
Customer Connection Points (Not M1 or M2 buses)
3
Start Relevant Battery - connection to this battery is not permitted
Battery Access Points
For auxiliary customer loads, only connect to the
customer connection points provided (not on M1
and M2 Buses).
102
Description
FordTransit 2006.5 (April 2006 )
1
3
2
Date of Publication: 12/2006