Vermont Castings KSTDV500 Installation And Operating Instructions Manual page 20

Kstdv series direct vent gas fireplace
Table of Contents

Advertisement

KSTDV Series Gas Fireplace
1 0
Nails
Figure 25 -
If Area Above is Not a Room, Install Firestop above
Framed Hole as Shown
2. Assemble the desired lengths of pipe and elbows nec-
essary to reach from the burner system flue up through
the firestop. Be sure pipe and elbow connections are
fully twist-locked.
3. Cut a hole in the roof using the locating hole as a center
point. (Cover any exposed open vent pipes before
cutting hole in roof). The 10Z\x"x10Z\x" (267 x 267 mm)
hole must be measured on the horizontal. Actual length
may be larger depending on the pitch of the roof. There
must be a 1" minimum clearance from the vent pipe to
combustible materials. (Insulation should be considered
a combustible material).
Horizontal Overhang
2 ft.
Min.
Termination
Vent
Storm Collar
Flashing
Concentric
Vent Pipe
Figure 26 -
Minimum Chimney Clearance
20
1 0
"
/
1
1
2
/
"
2
Firestop
FP1970
firestop no room
2 ft. Min.
Vertical Wall
Lowest
Discharge
Opening
H*
X
FP1971
1" Minimum
Clearances to
Combustibles
FP1971
Min chimney clearance
4. Connect a section of pipe and extend up through the
hole.
noTe: If an offset is needed to avoid obstructions, you
must support the vent pipe every three (3) feet. Use wall
straps for this purpose. Page 18, Figure 21. Whenever
possible, use 45° elbows instead of 90° elbows. The 45°
elbow offers less restriction to the flow of the flue gases
and intake air.
5. Place the flashing over the pipe section(s) extending
through the roof. Secure the base of the flashing to
the roof and framing with roofing nails. Be sure roofing
FP1970
material overlaps the top edge of the flashing. There
must be a 1" clearance from the vent pipe to combustible
materials.
6. Continue to add pipe sections until the height of the vent
cap meets the minimum building code requirements as
shown in Figure 26.
noTe: You must increase vent height for steep roof
pitches. Nearby trees, adjoining roof lines, steep pitched
roofs, and other similar factors may cause poor draft or
down-drafting in high winds. Increasing the vent height
may solve this problem.
noTe: If the vent pipe passes through any occupied areas
above the first floor, including storage spaces and closets,
you must enclose pipe. You may frame and sheetrock the
enclosure with standard construction material. Make sure
to meet the minimum allowable clearances to combustibles.
Do not fill any of the required clearance spaces with
insulation.
TerMInaTIon heIGhT For VenTS aBoVe
FlaT or SlopeD rooFS
12
VenTInG InSTallaTIon
roof pitch
h (feet)
Flat to 6/12
1.0
Over 6/12 to 7/12
1.25
Over 7/12 to 8/12
1.5
Over 8/12 to 9/12
2.0
Over 9/12 to 10/12
2.5
Over 10/12 to 11/12
3.25
Over 11/12 to 12/12
4.0
*H - Minimum height from roof to
lowest discharge opening of vent
73D4125

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents