Break-In - Honda 1981 GL1100 interstate Owner's Manual

Table of Contents

Advertisement

Flooded Engine
If the engine fails to start after repeated
attempts, it may be flooded with excess
fuel. To clear a flooded engine, turn the
engme stop switch "OFF"
and push the
choke knob
down
to
Fully
Open (B).
Open the throttle
fully
and crairk the
engine with
the
electdc
stader
for
5
seconds. Turn
the
engine stop
switch
"ON"
and follow the High At
Tempera-
ture Starting Procedure.
BREAK-IN
During the first 600 miles (1,000
not operate the motorcycle at
8O7o of the lower RED ZONE
in any gear. Avoid full throttle
and do not operate for a long
speed.
During
initial
bieak-in, newly
surfaces will be in contact with
and these surfaces will wear in
Break-in
maintenance
at
(1000km) is designed to
this initial minor wear. Timely
ance of
the
break-in main
ensure optimum seNice life and
ance from the engine.
NOTE: (U SA ONL Y)
After
break-in maintenance,
"BREAK-IN"
cautiol
label
speedometer lens.
48

Advertisement

Table of Contents
loading

Table of Contents