Commissioning The Application - Siemens SINAMICS CU240S DP-F Operating Instructions Manual

Hide thumbs Also See for SINAMICS CU240S DP-F:
Table of Contents

Advertisement

Commissioning (software)
2.7 Commissioning modes
2.7.8

Commissioning the application

2.7.8.1
Commissioning the application
Commissioning the application
After the motor - Inverter combination has been commissioned using quick commissioning,
the following parameters should be adapted and set according to the requirements of your
specific application. As an example, the following points should be considered:
• Functional requirements of the inverter (for example, closed-loop process control with PID
• Limit values
• Dynamic requirements
• Starting torques
• Load surge requirement
• Overload
• Diagnostics.
If the application includes a function, which is not covered by the quick commissioning, then
the "Function" section in this manual or the parameter list should be consulted.
Note
In the factory setting, parameter changes are stored in the volatile memory of the inverter
(RAM). To safe the changes in the EEPROM one of the following methods can be used:
• Set P0014 = 1 all changes stored immediately in the EEPROM
• start data transfer from RAM to EEPROM via P0971 = 1 (when using OP) via
The durartion of the data transfer depends on the number of changed parameters. In some
cases it can last several minutes.
With the OP data transfer is displayed with "bUSY".
When using STARTER it is displayed via a progress bar. The sucessful transfer is displayed
via a dialog box.
2-30
controller)
STARTER).
Operating Instructions (Compact), 04/2006, A5E00766042B AA
(with
Control Units CU240S

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sinamics cu240sSinamics cu240s dpSinamics g120

Table of Contents