Primary/Secondary Gate Movement - Polaris 700 Installation Manual

Automatic gate operator
Hide thumbs Also See for 700:
Table of Contents

Advertisement

PRIMARY/SECONDARY GATE
MOVEMENT
For dual gate installations the timing of the gates
opening and closing can be adjusted. To set a dual
gate installation for both gates to open and close
simultaneously, set the DIP switches as follows.
Block 2, DIP 1 – ON position
Block 2, DIP 4 – OFF position
If it is desired to have one gate open and close prior to
the other, this can be accomplished by adjusting the DIP
switch settings.
Block 2, DIP 1 – ON position
Block 2, DIP 4 – ON position
Now determine which gate is desired to open first and
close second. Another DIP switch adjustment is required
to set this.
For primary gate operator (wired to operator 1
terminals) to open first and close second:
Block 2, DIP 5 – OFF position
For secondary gate operator (wired to operator 2
terminals) to open first and close second:
Block 2, DIP 5 – ON position
The delay in opening and closing is always set for two
seconds.

PRIMARY/SECONDARY GATE MOVEMENT

Control Box Cover
Once you have programmed your remote/keypad, you
can then install the cover of the control box. Use five #10
x 3/4" screws to secure the cover to the control box.
28

Advertisement

Table of Contents
loading

This manual is also suitable for:

702502500702502500

Table of Contents