Wire Connection - Thermador PROFESSIONAL HPCN36NS Installation Manual

Thermador professional chimney hoods
Hide thumbs Also See for PROFESSIONAL HPCN36NS:
Table of Contents

Advertisement

Available languages

Available languages

Wire Connection

Wire Routing
1. Run a 120V AC, 15 amp circuit power cable from the
service panel through one of the holes in the top plate.
2. Connect black wire to power supply black wire, white
wire to power supply white wire and green wire to
green wire or bare wire.
Green to green
or bare wire
3. Place all wiring connections inside the junction box
channel. Reinstall on the top plate. Ensure that the
wires are secure and that no wires are pinched.
English 12
Figure 11: Route Wire
White to white
Black to black
Figure 12: Wire Connection
EXTNCB25 Blower Connection Cable
(optional)
PARTS INCLUDED:
Blower Extension Cable Connection
The internal blower harness should be routed through the
knockout and secured with a 1" (25.4 mm) strain relief. The
remote harness can then be connected to the blower
harness outside the unit (refer to Figure 11).
Connects to
Remote or
Inline blower
Figure 13: Optional Blower Connection Cable
IMPORTANT:
Cutting of the connector will void the warranty of the
appliance.
The blower extension cable is compatible with the
following Inline & Remote blowers:
BLOWER
Remote Blower
Remote Blower
Remote Blower
Inline Blower
Inline Blower
*Indicates a letter designating the release year.
1 – 25ft cable
2 – Adapter Cables
(NOT NEEDED for
HPCN or HPCB
models)
Connects
to Hood
25ft cable
SKU
VTR630*
VTR1030*
VTR1330*
VTI610*
VTI1010*

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents