Chapter 2 Hardware Installation; Preparations - SOYO SY-7VBA 133 User Manual

Hide thumbs Also See for SY-7VBA 133:
Table of Contents

Advertisement

Hardware Installation
HARDWARE INSTALLATION
Congratulations on your purchase of SY-7VBA 133 Motherboard. You are
about to install and connect your new Motherboard.
Note: Do not unpack the Motherboard from its protective anti-
static packaging until you have made the following preparations.

2-1 PREPARATIONS

Gather and prepare all the following hardware equipment to complete the
installation successfully:
1.
Socket 370 processor with built-in CPU cooling fan (boxed type).
Note: This Motherboard supports non-boxed type CPUs. The heavier
CPU cooling fan requires the installation of a CPU support stand.
2.
DIMM memory module (s)
3.
Computer case and chassis with adequate power supply unit
4.
Monitor
5.
PS/2 Keyboard
6.
Pointing Device (PS/2 mouse)
7.
Speaker(s) (optional)
8.
Disk Drives: HDD, CD-ROM, Floppy drive ...
9.
External Peripherals: Printer, Plotter, and Modem (optional)
10.
Internal Peripherals: Modem and LAN cards (optional)
Chapter 2
20
SY-7VBA 133

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents