Installation Checklist - Trane 190 Installation & Operation Manual

Raul air cooled condensing unit
Table of Contents

Advertisement

INSTALLATION CHECKLIST

RAUL Trane Air Cooled Condensing Unit
This list must be checked off by the installer to ensure correct installation before the unit starts up.
Unit acceptance
o Check for damage, if any, on transportation
o Check for equipment shipped against delivery slip
o Check lifting system
Unit positioning
o Remove packaging
o Check position of unit
o Check unit is level
o Check clearance around condenser
o Check clearance required for maintenance access
o Check position of rubber pads
Refrigerant circuit
o Check filter dryer and sight glass presence
o Check oil traps presence on discharge line (if there vertical risers>3m)
o Check pitch for horizontal lines (1cm/m)
o Check refrigerant presence
Electrical equipment
o Check direction of rotation of compressors and fan motors
o Check installation and rating of mains power switch/fuse
o Check that electrical connections comply with specification
o Check that electrical connections match information on manufacturer's identification plate
o Check electrical connections and connections to mains power switch
General
o Check available cooling charge (50% of rated installation load)
o Check with other trades handling installation works
Comments: .......................................................................................................................................................................................
...........................................................................................................................................................................................................
...........................................................................................................................................................................................................
...........................................................................................................................................................................................................
Signature: ............................................................Name .................................................................................................................
Order N° ..........................................................................................................................................................................................
Work site: ........................................................................................................................................................................................
Please return to your local Trane Service Office.
16
RAU-SVX01F-E4

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents