Installation and commissioning
8

Connecting the plug-in connections and earth cables

.01.07
28
1
Fig. 8 - 07
Connect all plugs as labelled to the control box 1.
Screw the earth cable from the sewing head and the main switch to earth point A.
Connect earth point A to earth point B with earth cable 2.
Screw the earth cable 3 from the motor to earth point B.
2
A
B
2
3