Fujitsu Siemens Computers PRIMERGY BX600 S2 Operating Manual page 74

Hide thumbs Also See for PRIMERGY BX600 S2:
Table of Contents

Advertisement

Installation Sequence
The order in which the server blade slots are filled depends on whether you are
using 2-way server blades or 4-way server blades or a mix of the two, and how
the server blades are equipped.
Configuration Diagram for 2-way Server Blades
– Slot 4 is filled first.
– Next, slots 5 through 10 are filled in numerical order, followed by slots 1
through 3.
– 2-way server blades with SCSI controller in a PCI extension module can only
be installed in slots 5 and 6 because of the cabling arrangement in the rack
(see
section "Cable Routing" on page
1
2
8
9
Figure 31: Installation sequence for 2-way server blades
74
3
4
5
1
2
10
43).
6
7
8
3
4
5
PRIMERGY BX600 S2 Basic Unit
Server Blades
9
10
6
7

Advertisement

Table of Contents
loading

Table of Contents