Vertical Through-The-Roof Applications & Installation - Vermont Castings 36CDVZRRN Installation Instructions And Homeowner's Manual

Table of Contents

Advertisement

CDVZ Series Direct Vent Gas Fireplace
Do not back fill around snorkel. A clearance
of at least 4" (102 mm) must be maintained
between the snorkel and the soil.
If the foundation is recessed, use recess brackets (not
supplied) for securing lower portion of the snorkel. Fasten
brackets to wall first, then secure to snorkel with self drilling
#8 x 1/2 sheet metal screws. It will be necessary to extend
vent pipes out as far as protruding wall face. (Fig. 35)
Foundation Recess
Recess Brackets
Watertight Seal
Around Pipe
Fig. 35 Snorkel installation, recessed foundation.
BG401
Vertical Through-the-Roof Applications
Snorkel
This Gas Fireplace has been approved for:
2/10/99 djt
1. Vertical installations up to 50' (15 m) in height. Up to
10' (3 m) horizontal vent run can be installed within the
vent system using a maximum of three 90° elbows.
2. Up to two 45° elbows may be used within the horizontal
run. For each 45° elbow used on the horizontal level
the maximum horizontal length must be reduced by
18" (457 mm).
Minimum
8' (2.4 m) /
Maximum
50' (15 m) Vertical
Rise
Fig. 36 Support straps for horizontal runs.
CFM148
20
Snorkel
Wall Screws
Sheet Metal
Screws
BG401
Maximum
10'
(3 m)
Pipe Straps Every 3'
(914 mm)
CFM148
Example: Maximum horizontal length
0 x 45° elbows = 10' (3 m)
1 x 45° elbows = 8¹⁄₂' (2.6 m)
2 x 45° elbows = 7' (2.1 m)
3. A minimum of an 8' vertical rise.
4. Two sets of 45° elbows offsets within these vertical
installations. From 0 to a maximum of 8' (2.4 m) of vent
pipe can be used between elbows. (Fig. 37)
5. 7DVCS must be used to support offsets. (Fig. 36) This
application will require that you first determine the roof
pitch and use the appropriate 7DVSKV (A, B or F).
(Refer to Venting Components List, Page 27)
Max.
8'
(2.4 m)
45°
Max.
8'
(2.4 m)
45°
Typical Offset Installation
Fig. 37 Typical vertical roof applications.
FP1021
Vertical Through-the-Roof Installation
Typical vertical
through the roof
1. Locate your fireplace.
application
2. Plumb to center of the (4") flue collar from ceiling above
3/26/00 djt
and mark position.
3. Cut opening equal to 9³⁄₈" x 9³⁄₈" (240 x 240 mm). 10³⁄₈"
x 9³⁄₈" (264 x 240 mm) when using 7TCRVT1320.
4. Proceed to plumb for additional openings through the
roof. In all cases, the opening must provide a minimum
of 1 inch clearance to the vent pipe, i.e., the hole must
be at least 9³⁄₈" x 9³⁄₈" (240 x 240 mm).
5. Place fireplace into position.
6. Place firestop(s) #7DVFS or Attic Insulation Shield
#7DVAIS into position and secure. (Fig. 38)
7. Install roof support (Fig. 39) and roof flashing making
sure upper flange is below the shingles. (Fig. 40)
Typical Ceil-
ing Support
50'
Application
(15 m)
Typical Roof
Support Ap-
plication
FP1021
20014621

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

36cdvztrn

Table of Contents