Checking And Testing Operations - Samsung AM18B1C09 Owner's Instructions & Installation Manual

Multi-split type room air conditioner
Hide thumbs Also See for AM18B1C09:
Table of Contents

Advertisement

C
I
OMPLETING THE
NSTALLATION

Checking and Testing Operations

48
E-
To complete the installation, perform the following checks and tests
to ensure that the air conditioner is operating correctly.
1
Review all the following elements in the installation:
Installation site strength
Piping connection tightness to detect any gas leakages
Connection wiring
Heat-resistant insulation of the piping
Drainage
Earthing wire connection
Correct operations (follow the steps below)
2
Press the On/Off button.
Result:
The indicator lights on the indoor unit flash at
half-second intervals.
While the indoor unit opens, the indoor unit fan runs
to start.
3
Press the
button.
Result:
The outdoor unit operates in cooling mode as
following the room temperature.
4
Air flow direction
Press the
button and check that the air
flow blades work properly.

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Am27b1c07Am27b1c13Um18b1c2Um26b1c2Am26b1c13Um27b1c3

Table of Contents