Connecting Up And Purging The Circuit - Samsung AS12A1VC Owner's Instructions & Installation Manual

Ductless mini-split
Table of Contents

Advertisement

AS12A1VC-E
1/26/00 3:16 PM
C
I
OMPLETING THE
NSTALLATION

Connecting Up and Purging the Circuit

Outdoor unit
Gas pipe side
A
Liquid pipe side
B
B
(liquid)
Valve stem
38
E-
Page 16
The outdoor unit is loaded with sufficient R-22 refrigerant for 16.4 feet
of piping. The air in the indoor unit and in the pipe must be purged.
If air remains in the refrigeration pipes, it will affect the compressor,
reduce to cooling /heating capacity and could lead to a malfuction.
Refrigerant for air purging is not charged in the outdoor unit. Use Vacuum
Pump as shown at the figure.
Indoor unit
1
C
2
D
3
4
5
6
Vacuum Pump
7
8
A
(gas)
Adding Refrigerant
Refrigerant must be added if the piping measures more than 5 metres in length
(maximum of 10 metres). This operation can only be performed by a qualified
refrigeration specialist.
Stem cap
Refer to the Service Manual for more details on this operation.
If you have used...
More than 16.4'
of piping
Less than 16.4'
of piping
Connect each assembly pipe to the appropriate valve on the outdoor unit
and tighten the flare nut.
Referring to the illustration opposite, tighten the flare nut on section B first
manually and then with a wrench, applying the following torque.
Pipe
Outer Diameter
Liquid refrigerant
6.35 mm(1/4")
Gas refrigerant
9.52 mm(3/8")
Gas refrigerant
12.70 mm(1/2")
Connect the charging hose of low pressure side of manifold gauge to the
packed valve having a service port (3/8" or 1/2" Packed valve) as shown
at the figure.
Open the valve of the low pressure side of manifold gauge counter-
clockwise.
Purge the air from the system using vacuum pump for about 10 minutes.
- Close the valve of the low pressure side of manifold gauge clockwise.
- Remove the hose of the low pressure side of manifold gauge.
Set valve cork of both liquid side and gas side of packed valve to the open
position.
Mount the valve stem nuts to the 2-way and 3-way valve.
And mount the service port cap to 3-way valve.
Check for gas leakage.
- At this time, especially check for gas leakage from the 3-way valve's
stem nuts, and from the service port cap.
Then...
0.1 oz of refrigerant (R-22)
must be added for each
extra foot.
The purge time is normal.
Torque (kg . cm)
3
160(11 ft•lb)
5
300(21 ft•lb)
3
4
2
500(36 ft•lb)
5

Hide quick links: