INITIAL SOLUTION AND
REFRIGERANT CHARGING
Lithium bromide solution and refrigerant (water) will be
placed in the chiller at initial start-up. Do not charge solu-
tion into chiller until the unit is ready for operation.
Copyright 1996 Carrier Corporation
Manufacturer reserves the right to discontinue, or change at any time, specifications or designs without notice and without incurring obligations.
Book 2
PC 211
Tab
5b
Fig. 17 — Capacity Controls
Catalog No. 531-611
Printed in U.S.A.
Do not start any pump motors until the chiller has been
charged with solution and refrigerant. The hermetic pumps
can be seriously damaged by dry operation.
See 16JT Start-Up, Operation, and Maintenance instruc-
tions for charging procedures.
Form 16JT-3SI
Pg 12
8-96
Replaces: 16JT-2SI