Checklist - Payne PG9MAB Series A Installation Manual

4-way multipoise fixed-capacity dual-vent condensing gas furnace sizes 040 thru 140 series a
Hide thumbs Also See for PG9MAB Series A:
Table of Contents

Advertisement

CHECKLIST

1. Put away tools and instruments. Clean up debris.
2. Verify flame rollout manual reset switch has continuity.
3. Verify that blower and main access doors are properly installed.
4. Cycle test furnace with room thermostat.
5. Check operation of accessories per manufacturer's instructions.
6. Review User's Guide with owner.
7. Leave literature packet near furnace.
—61—

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents