Checklist — Installation; Load Calculation; Combustion And Vent Piping - Carrier Infinity ICS 58MVC Installation Instructions Manual

Direct vent 4-way multipoise condensing gas furnace with idealcomfortt idealhumidity
Hide thumbs Also See for Infinity ICS 58MVC:
Table of Contents

Advertisement

LOAD CALCULATION

________________
________________
________________

COMBUSTION AND VENT PIPING

Termination Location
________________
________________
________________
________________
________________
________________
________________
________________
________________
________________
________________
________________
________________
________________
________________
Pipe Insulation
________________
________________
Copyright 2007 Carrier Corp. S 7310 W. Morris St. S Indianapolis, IN 46231
Manufacturer reserves the right to change, at any time, specifications and designs without notice and without obligations.
CHECKLIST — INSTALLATION
Heating Load (Btuh)
Cooling Load (Btuh)
Furnace Model Selection
Vent
Roof
Sidewall
Combustion--- Air
Roof
Sidewall
Attic
Crawl Space
Termination Kit--- 2 Pipe or
Concentric
Combustion--- Air Pipe Length
Combustion--- Air Pipe Elbow
Quantity
Vent Pipe Length
Vent Pipe Elbow Quantity
Pipe Diameter Determined from
Sizing Table
Pipe Sloped To Furnace
Over Ceilings
Low--- Ambient Exposed Pipes
________________
________________
________________
________________
________________
________________
________________
________________
________________
________________
________________
________________
________________
________________
Printed in U.S.A.
Edition Date: 09/07
60
Condensate Drain
Unit Level or Pitched Forward
Internal Tubing Connections
Free of Kinks and Traps
External Drain Connection Leak
Tight and Sloped
Condensate Trap Primed before
Start--- Up
Heat Tape Installed if Required
CHECKLIST --- START ---UP
Gas Input Rate (Set Within 2
percent of Rating Plate)
Temperature Rise Adjusted
Thermostat Anticipator
Anticipator Setting Adjusted or
Cycle Rate (3 Cycles per Hr)
Selected
Safety Controls Check Operation
CHECKLIST --- START ---UP
Gas Input Rate (Set Within 2
percent of Rating Plate)
Temperature Rise Adjusted
Thermostat Anticipator
Anticipator Setting Adjusted or
Cycle Rate (3 Cycles per Hr)
Selected
Safety Controls Check Operation
Primary Limit
Pressure Switches
Catalog No: 58MVC ---2SI
Replaces: New

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

58mvc idealcomfort idealhumidity

Table of Contents