Joining Instructions; Installing Coil Cover And Drip Tray - Hussmann P/N 0420057_B Installation And Operation Manual

Service merchandisers
Table of Contents

Advertisement

1-8
I
NSTALLATION
11. Re-apply caulk or silicone as required.
12. Verify glass is positioned and operating cor-
rectly.

JOINING INSTRUCTIONS

Sectional construction means that two or more
merchandisers may be joined in line yielding
one long continuous display requiring only one
pair of ends.
All joints must be air-tight to prevent formation
of ice or condensation.
Refer to the detailed information provided in the
separate Joining Instruction shipped with each
case.
INSTALLING COIL COVER AND
DRIP TRAY
Each gravity coil in these service merchandisers
has a 4 ft (1219 mm) stainless steel coil cover
and molded plastic drip tray. A condensate drip
tube is factory installed.
P/N 0420057_B
Pivot Support
Check the drip tray for obvious damage before
installation. Damaged or leaking drip trays must
be replaced. Remove any loose debris and clean
the drip tray before installing.
Coil cover hooks and drip tray hooks are factory
installed at the front and back in each gravity
coil. Hanging holes are formed in the cover and
drip tray.
U.S. & Canada 1-800-922-1919 • Mexico 1-800-522-1900 • WWW.HUSSMANN.COM
Adjusting Bolt
Set Screw
Positive Stop
Coil Cover
Drip Tube
Connection

Advertisement

Table of Contents
loading

This manual is also suitable for:

Impact

Table of Contents