Replacing An Sfp Module - IBM System Storage DS5020 Installation, User's, And Maintenance Manual

Storage subsystem
Hide thumbs Also See for System Storage DS5020:
Table of Contents

Advertisement

6. Place the battery unit that you removed on a level surface.
7. Unpack the new battery unit. Set the new battery unit on a dry, level surface.
8. Insert the new battery unit into the controller chassis. Make sure the new battery
9. Once the battery is charged to the optimal state from the reduced-charge

Replacing an SFP module

Statement 3:
CAUTION:
When laser products (such as CD-ROMs, DVD drives, fiber-optic devices, or
transmitters) are installed, note the following:
v Do not remove the covers. Removing the covers of the laser product could
v Use of controls or adjustments or performance of procedures other than
Attention:
This product contains a sealed Lithium Ion battery. Discharged
Lithium and Lithium Ion batteries are currently designated to be disposed of in
normal trash. However, users should contact their municipal waste disposal
facility prior to discarding any used battery in normal trash. Alternatively, you
can return Lithium, Lithium Ion and Lithium Ion battery packs to IBM for
recycling.
In the United States, IBM has established a collection process for reuse,
recycling, or proper disposal of used IBM Lithium, Lithium Ion and Lithium Ion
battery packs. For information on proper disposal of these batteries, please
contact IBM at 1-800-426-4333. Please have the IBM part number listed on the
battery available prior to your call.
For information on disposal of sealed Lithium Ion batteries outside the United
States, go to www.ibm.com/ibm/environment/products/batteryrecycle.shtml or
contact your local waste disposal facility.
Save all packing materials in the event you need to return the new battery unit.
unit is inserted in the correct orientation in the battery unit bay. Press the battery
unit fully into the bay until it clicks into place. Do not force fit. The battery unit is
designed to prevent it from being inserted into the chassis incorrectly.
Note: The green Battery Charging LED flashes until the battery is fully charged.
shipping state, the battery performs a learn cycle to access the discharge time
of the battery. Do not turn off the power to the storage subsystem for at least 24
hours to ensure that the battery finishes charging and completes the first learn
cycle.
result in exposure to hazardous laser radiation. There are no serviceable
parts inside the device.
those specified herein might result in hazardous radiation exposure.
Chapter 5. Replacing components
149

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents