Maintenance - Amprobe AM-520-EUR User Manual

Hvac multimeter/true-rms electrical contractor multimeter/digital multimeter
Hide thumbs Also See for AM-520-EUR:
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 1
MAINTENANCE AND REPAIR
If the Meter fails to operate, check battery, test leads, etc., and replace as
necessary.
Double check the followings:
1. Replace the fuse or battery if the meter does not work.
2. Review the operating instructions for possible mistakes in operating
procedure.
Quick check on 0.5A FUSE:
Step 1: Turn the rotary switch to Ω function.
Step 2: short-circuit E/V/Ω/Hz terminal and mA/μA terminal.
Resistance reading ≤ 1MΩ: the fuse is OK
Resistance reading "OL": the fuse is open. Replace the fuse as specified.
Quick check on 10A FUSE:
Step 1: Turn the rotary switch to Ω function.
Step 2: short-circuit E/V/Ω/Hz terminal and mA/μA terminal.
Resistance reading ≤ 0.5Ω: the fuse is OK.
Resistance reading "OL": the fuse is open. Replace the fuse as specified.
17

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Am-530-eurAm-530Am-520

Table of Contents