Vent /Intake Terminations For Installation Of Multiple Direct Vent Furnaces; Oncentric Ent Ermination; Condensate Drain Lines & Drain Trap; General - Goodman GMS95 Installation Instructions Manual

Gas-fired warm air furnace
Table of Contents

Advertisement

Horizontal terminations should be as shown in the following fig-
ure. Refer to Section IX, Vent/Flue Pipe and Combustion Pipe -
Termination Location for location restrictions. A 2 3/8 inch diameter
wall penetration is required for 2" diameter pipe while a 3 1/2 inch
diameter hole is required for 3" diameter pipe. To secure the pipe
passing through the wall and prohibit damage to piping connec-
tions, a coupling should be installed on either side of the wall and
solvent cemented to a pipe connecting the two couplings. The
pipe length should be the wall thickness plus the depth of the
socket fittings to be installed on the inside and outside of the wall.
The wall penetration should be sealed with silicone caulking ma-
terial.
3" MIN
24" MAX
Standard Horizontal Terminations (Dual Pipe)
24" MAX
Alternate Horizontal Vent Termination (Dual Pipe)
3" MIN.
24" MAX.
SUPPORT
STRAPS
COMBUSTION
AIR INTAKE.
12" MIN. ABOVE
SCREEN
HIGHEST ANTICIPATED
90°
SNOW LEVEL
MEDIUM
RADIUS
ELBOWS
Standard Horizontal Terminations Above Anticipated Snow
Level (Dual Pipe)
12" MIN
3" MIN
24" MAX
90°
MEDIUM
RADIUS
ELBOW
24" MAX
3" MIN
AIR
INTAKE
12" MIN
12" MIN.
VENT/FLUE
TEE
12" MIN. ABOVE
HIGHEST ANTICIPATED
SNOW LEVEL
Alternate Vent Termination Above Anticipated Snow Level
In a basement installation, the pipes may be run between the joist
spaces. If the pipes must go below the joist and then up into the
last joist space to penetrate the header, two 45° elbows should be
used to reach the header rather than two 90° elbows.
V
/I
T
ENT
NTAKE
ERMINATIONS
D
V
F
IRECT
ENT
URNACES
If more than one direct vent furnace is to be installed vertically
through a common roof top, maintain the same minimum clear-
ances between the exhaust vent and air intake terminations of
adjacent units as with the exhaust vent and air intake terminations
of a single unit.
If more than one direct vent furnace is to be installed horizontally
through a common side wall, maintain the clearances as in the
following figure. Always terminate all exhaust vent outlets at the
same elevation and always terminate all air intakes at the same
elevation.
24" Max.
Horizontal Venting Of Multiple Units
C
V
T
ONCENTRIC
ENT
ERMINATION
Refer to the directions provided with the Concentric Vent Kit (DCVK)
for installation specifications.
X. CO
X. CO
X. COND
X. CO
X. CO
NDENSA
ND
ND
ND
ENSA
ENSATE DRAIN LINES & DRAIN TRAP
ENSA
ENSA
TE DRAIN LINES & DRAIN TRAP
TE DRAIN LINES & DRAIN TRAP
TE DRAIN LINES & DRAIN TRAP
TE DRAIN LINES & DRAIN TRAP
G
ENERAL
A condensing gas furnace achieves its high level of efficiency by
extracting almost all of the heat from the products of combustion
and cooling them to the point where condensation takes place.
The condensate which is generated must be piped to an appropri-
ate drain location.
18
(Dual Pipe)
F
I
M
OR
NSTALLATION OF
ULTIPLE
Vents
90°
Medium
Radius
Elbows
3" Min.
24" Max.
3" Min.
24" Max.
3" Min.
Screen

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents