Attaching The Cables - Diamond Engineering 6000 User Manual & Setup Manual

Desktop antenna measurement system
Table of Contents

Advertisement

Chapter 1 - Installation and Configuration

Attaching the cables

Y
ou should have received 5 Seperate Cables and a power supply with your DAMS System.
1. 2- 10 Ft. Custom Calibrated SMA cable.(1-20' Cable Optional)
2. 1- USB cable.
3. 2- 6m Platform control cables
Step 1. connect the USB cable to the Platform Controller. DO NOT CONNECT TO PC YET.
Step 2. connect the Power Supply wire to the Platform Controller.
Step 3. connect one end of the Calibrated SMA cable to the bottom of the platform.
Step 4. Attach other end of SMA cable to your Analyzer. **USE CARE** cable damage can compromise antenna
results.
Step 5. Connect the straight end of the yellow cable with the black band on the connector to the
"Horizontal" port on the Platform Controller and the non-banded cable to the "vertical" port.
Step 6. Connect the other ends the yellow cables to the platform. the banded right-angle connector connects to the
turntable. and the non-banded connector goes to the vertical actuator.
15
Cable Connections

Advertisement

Table of Contents
loading

Table of Contents