Download Print this page

Step 3: Front Wall - Arrow Storage Products Commander series Owner's Manual & Assembly Manual

Hide thumbs Also See for Commander series:

Advertisement

Step 3: Front Wall

You will need for this page:
LS
SB
(QTY: 34)
(QTY: 24)
Left Front Wall Assembly
10640
10652
10627
10628
10627
10628
10627
10673
LS
10638
2
10640
Wall Post
Right Front Wall Assembly
10652
10640
SB
SB
LS
SB
SB
LS
10628
LS
SB
SB
LS
SB
LS
SB
LS
10628
LS
LS
SB
SB
SB
SB
Fascia pieces should fi t inside Front Frame as shown.
Door Header Assembly
2
10652
10627
Wall Post
Front Wall
(Hinge)
Channel
1
Lay out the parts and position them as
shown. Double check that holes align as
shown. If holes do not align, the Wall Post
(Hinge) is most likely upside-down.
Insert the Front Wall Channels into the Wall
2
Post and Wall Post (Hinge) as shown and
secure with Small Bolts and Nuts.
3
Insert Front Wall Diagonals into the Front
Wall Assembly as shown and secure with
Large Screws.
4
Assemble two Front Frames together with
the Long and Short Fascias as shown
below and secure using Large Screws.
Part 10627 Front Wall Channel may be joined in
pairs. Bend to separate.
10627
10673
16
6
4
10628
Front Wall
Front Frame
Diagonal
1
10638
Long Fascia
10627
10639
LS
10639
16H
2
10673
1
10639
Short Fascia
SNAP
10673

Advertisement

loading

This manual is also suitable for:

Mountaineer series