HP B6960-96035 Concepts Manual page 326

Hp projector user manual
Table of Contents

Advertisement

Media pool name
P_DB_Pool
D_DLT_Pool
D_DAT_Pool
D_DB_Pool
Backup Specifications
Configure backup specifications as follows:
• DB_A...G
Backup specifications for each of the 7 IDBs and configuration files. Schedule
the backup specification such that Data Protector will run a weekly full backup
and a level one incremental every day, except Sundays at 03.00.
Why use differential (incr1) backups?
• To restore the latest data only two media sets need to be accessed, one
for the latest full backup and one for the latest level 1 incremental backup
prior to the restore point-in-time. This considerably simplifies and speeds
up the restore. Where simple incremental backups are used, the number
of media sets may increase considerably, making the restore process more
complex and slower.
Two copies of the IDB and configuration files should be made, for security
reasons.
• SAP_A...C
Backup specification for the SAP database servers in cells A, B and C,
respectively. Use the staggering approach to avoid network load, device load,
and time window issues as depicted in
Table 26 The Staggering Approach for ABC Cape Town
Cell A
Cell B
326
Backup scenarios
Location
Pretoria
Durban
Durban
Durban
Mon
Tue
Wed
Incr1
Incr1
Incr1
Incr1
Incr1
Incr1
Description
IDB
HP StorageWorks DLT 41 15w
Library
HP StorageWorks DAT24
autoloaders
IDB
Table 26
on page 326:
Thu
Fri
Incr1
Full
Incr1
Incr1
Sat
Sun
Incr1
Full

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Data protector a.06.10

Table of Contents