Section 4: Wiring; Installing The Fireplace Control Box; Installation Of Electrical Supply - Montigo R520 Installation & Maintenance Manual

R-series indoor residential fireplace
Table of Contents

Advertisement

Section 4: Wiring

Installing the Fireplace Control Box

Install the Fireplace Control Box in an accessible location. The
location should be where maintenance, adjustments and service
may be made easily.
Control Cable Installation
required for either Horizontal
or Vertical Termination Vent
Horizontal
Power Vent
Termination
Control
110Vac 60 Hz
Box
supply from
Distribution Panel
Power
Wall Switch
Vent
Figure 15.
R520* / R620* Series Control Box / Power Vent Wire Routing
Diagram
XG0771 - 040513.3
Installation
Vertical
Power Vent
Termination
R520 & R620 Power Vent Indoor Gas Fireplace
Page 25

Advertisement

Table of Contents
loading

This manual is also suitable for:

R620R520n-iR520l-iR620n-iR620l-i

Table of Contents