Exmark Viking Hydro Operator's Manual page 19

Hide thumbs Also See for Viking Hydro:
Table of Contents

Advertisement

3.15
Install drive lever linkages:
Refer to figure 6. Position speed control lever in neutral. Position drive levers in
neutral and engage the neutral lock latches (See Figure 9(b)). Drive lever
linkages are shipped with upper ball joints installed. Thread a 3/8-24 LH jam nut,
from the bolt bag, onto the lower end of each drive lever linkage. Identify the
lower ball joints installed on hydro control arm weldments. Thread lower end of
each drive lever linkage into the lower ball joint until hole in upper ball joint aligns
with hole in drive lever. Install 5/16-18 x 1 3/4 hex cap screws and 5/8-18 nyloc
nuts from the bolt bag and tighten. This will give an approximate setting for drive
lever linkages; you will need to refer to Section 5.2.9 step d to complete the drive
lever linkage adjustment.
DRIVE LEVER LINKAGE INSTALLATION
3.16 Install park brake lever:
Refer to Figure 7. Install the park brake lever to the inside of the park brake
bracket with the lever facing outward using the hardware installed in the park
brake bracket pivot. Install the bolt from the outside with the washer under the
head of the bolt. Install the nyloc nut and tighten. Insert the linkage into the hole
in the park brake lever form the outside and install the hairpin.
PARK BRAKE LEVER INSTALLATION
FIGURE 6
FIGURE 7
- 14 -

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents