GBC 54C Installation & Operation Manual page 28

Spire ii series
Table of Contents

Advertisement

Figure 33. Separating film from the release liner.
5. Pull the laminate down, allowing it to drape over
the Upper Main Roller.
Ensure that the film is pulled evenly and that no
bulges exist at either end of the idler bar.
Figure 34. Pulling laminate film to Upper Main Roller.
6. Remove the Pressure Plate.
Refer to the "Removing the Pressure Plate"
7.
Remove the Feed Table.
Refer to the "Feed Table" section.
WARNING: Removing the Feed Table exposes
moving parts. This means you can be harmed when
the Feed Table is removed. Make sure to install the
Feed Table when film loading is completed.
8. For the Lower media, guide the media around the
idler and up to the Main Rollers.
9. While pulling evenly, carefully align the edges of
the media with the laminating film, and press the
two together.
It is important that the tension is even from one
end of the supply rolls to the other.
Page 6-4
SPIRE II Series – Installation and Operating Instructions
Figure 35. Attaching mounting adhesive (on bottom)
10. Lower the Upper Main Roller just enough to
make contact with the Bottom Main Roller.
Figure 36. Upper and lower films attached to each other.
11. Replace the Feed Table and Pressure Plate.
12. Press a threading card into the nip of the Main
Rollers, pushing the media into the nip.
Figure 37. Pressing a threading card into the nip.
13. Press the Footswitch and guide the film to the
Main Rollers.
14. Adjust the Rewinder tension so that the release
liner does not pull into the nip area.
15. Use the Upper and Lower Unwind Tension Knobs
to apply minimum braking to the shafts.
to the PSA.

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

64cSpire ii 54cSpire ii 64c

Table of Contents