Basic Operating Procedure
1-4-2
Procedures Prior to Starting Communications
1,2,3...
Use the following procedure to configure the Unit using CX-Profibus:
1. Wire the network, to connect the PROFIBUS-DP Gateway Unit to the mod-
ules on Host Link or Compoway-F interface.
2. Turn ON the PLC power supply and the power supply of the PROFIBUS-
DP Gateway Unit.
3. In CX-Profibus, create a network and define the parameters and I/O con-
figurations for the PROFIBUS-DP Gateway Unit settings and the allocated
modules. Determine the baud rate and the bus parameter setup,
tion 2-6 Configuring the PROFIBUS-DP network .
4. Download the network configuration to the PROFIBUS-DP master. After
downloading the configuration, CX-Profibus will restart the PROFIBUS-DP
master automatically.
5. After restarting the PROFIBUS-DP Gateway Unit it will automatically start
communication.
Section 1-4
see sec-
15