Fujitsu PRIMECENTER M1 User Manual page 94

19-inch rack system for primergy, primequest, bs2000, storage
Table of Contents

Advertisement

Power Distribution
7.3.5.1
Installation options for 700 mm wide asymmetrical racks
Rack height
Installation direction
vertically
42 HU
4x
24 HU
4x
Table 14: Installation options for 700 mm wide asymmetrical racks
Performing the task
Ê Install two PDU brackets as described on
Figure 61: Single-phase 8-way 10 A socket strip mounted in a 700 mm wide asymmetrical rack
Ê Screw the socket strip with 2 screws onto the PDU brackets.
94
Installation direction
horizontally
Max. 4x with PDU kit 2 HU / 3 HU
Max. 4x with PDU kit 2 HU / 3 HU
page
71.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents