Fujitsu PRIMECENTER M1 User Manual page 118

19-inch rack system for primergy, primequest, bs2000, storage
Table of Contents

Advertisement

Optional accessories
Installing an earthing cable at the side walls
I
Remove the side wall at the right side of the 600mm rack as well as of
asymmetrical racks before assembling the earthing cables.
The installation order is as follows:
Figure 82: Opening the side panel lock
Ê Open the side wall lock with the door key
Ê Open all quarter-turn locks by using the key head or a coin
Ê Remove the side wall by lifting it up
1
This step not necessary for the left side wall.
118
1
1
1

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents