How To Install; Unpacking The Air Conditioner; Preparing The Air Conditioner - Haier HWE18VCN User & Care Manual

Room air conditioner
Hide thumbs Also See for HWE18VCN:
Table of Contents

Advertisement

Available languages

Available languages

UNPACKING THE AIR CONDITIONER

When moving or lifting the air conditioner, use two or more people.
Wear gloves when handling the air conditioner to protect against
REMOVE PACKAGING MATERIALS
• Remove packaging materials. Save the carton and the foam packaging for storing the unit when
not in use.
NOTE:
T
h
e
e r
a
e r
N
O
i
t n
open the cabinet.
• Handle the air conditioner gently.
• Keep the air conditioner upright and level. Do not set the air conditioner on its side, front, back
or upside down.
• The air conditioner must be standing upright for 2 hours prior to installation and operation.

PREPARING THE AIR CONDITIONER

Unpack unit in the floor near the installation location
1. Remove the two front attachment screws (A). Keep these screws for later use. Separate the
cabinet from the front panel. (See Fig.6)
2.
Remove the two screws per side (B) found at the bottom of the outer cabinet. Using the
basepan handle, slowly and evenly pull out the chassis from the cabinet. Use two or more
people to move the air conditioner.
CAUTION:
N
v e
r e
e
p x
o
grille to extreme temperatures.
WARNING
EXCESSIVE WEIGHT HAZARD
possible sharp edges and metal fins.
r e
a n
p l
a
k c
n i
g
m
t a
r e
l a i
e s
p
a l
t s
c i
r f
ont or

HOW TO INSTALL

i s
s n
d i
e
h t
e
i a
c r
o
n
d
t i
o i
Fig. 6
B
n
r e
o t
e r
m
o
e v
D
o
N
t o
A
B
ENGLISH
B
PAGE 11

Advertisement

Table of Contents
loading

This manual is also suitable for:

Hwe24vcnHwe15xcn

Table of Contents