Installation Guidelines; Front Panel Of The Dvr - Swann M88200H210313E User Manual

8 channel sdi digital video recorder
Table of Contents

Advertisement

English
Do not expose the DVR to moisture. Water is the arch-
enemy of electrical components and also poses a high risk
of electric shock.
Avoid dusty locations. Dust has a tendency to build up
inside the DVR case, leading to a high risk of failure or
even fire.
Only install the DVR in a well ventilated space. Like
all electronics, the circuitry and hard drive in the DVR
produce heat, and this heat needs a way out.
Do not open the DVR case except to install/swap the
hard drive inside. There are no user serviceable parts
inside.
1
1) USB 2.0 Port: For connecting USB external storage to the
DVR for backup, or for applying new firmware.
2) Play / Pause: Opens the playback interface from the live
viewing mode. Pauses playback or resumes playback when
paused.
3) Display: Changes the camera display from single view to
multi view. Subsequent presses will cycle through the different
views available.
4) HDD LED: Will flash whenever the DVR is writing to/reading
from the installed hard drive.
5) Power LED: Will be lit whenever the DVR is supplied power
and turned on.

Installation Guidelines

Front Panel of the DVR

4
5
2
3
6
6) Menu / Esc: Opens the DVR's menu, or goes back one step
from a submenu.
7) Select: Selects an option or item from a menu.
8) D-Pad: For navigating around menus when you're not
using the mouse.
9) Infrared Sensor: Monitors signals coming from the infra-
red remote control. If this sensor is blocked or obstructed,
then the functionality of the remote will be impaired.
Do not cut or modify any cable for any reason. Doing
so will void your warranty, as well as pose a great risk of
fire or electrical shock.
Do not expose the DVR to sudden bumps or shocks (for
example, being dropped). The DVR is as robust as possible,
but many of the internal components are quite fragile.
Remember that the DVR is, in all likelihood, going to be
left on 24 hours a day, 7 days a week. Keep this in mind
when choosing a location for installation.
Never open the case whilst the DVR is plugged in, and
never turn the DVR on whilst the case is open.
7
8
9
5

Advertisement

Table of Contents
loading

Table of Contents