[C] Sequence - Hoshizaki KML "F" SERIES Service Manual

Kml “f” series, kml “h” series modular crescent cuber
Table of Contents

Advertisement

[c] SEQUENCE

1st Cycle
1. Unit energized and Control Switch to "ICE"
position. Water supply cycle starts.
5. After the first 5 minutes in freeze cycle.
Ready to complete freeze cycle when Float
Switch circuit opens.
IMPORTANT
Board never accepts freeze completion signal
within the first 5 minutes in freeze cycle.
2. After 1 minute,
Defrost cycle starts.
3. Thermistor reads 48° F.
&
4. Defrost Timer stops counting.
Defrost cycle is completed and freeze cycle
starts.
IMPORTANT
1. Board never accepts defrost completion
signal within the first 2 minutes in defrost
cycle.
2. Defrost cycle time is limited to 20 minutes
even if Defrost Timer does not stop counting.
36
Defrost Timer starts counting.
IMPORTANT
Water Valve
opening is limited
to 6 minutes.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents