Run-In Operation Of Reassembled Engine - Robin EC05-2 Service Manual

Table of Contents

Advertisement

10.
R U N
IN OPERATION of REASSEMBLED ENGINE
An
overhauled engine must
be
carefully run-in to get proper surface condition
on newly installed parts.
Especially when cylinder, piston o r piston rings are replaced, a thorough run-in operation is indispensable.
The recommended run-in schedule is as follows:
LOAD
SPEED
TIME
EC05-2
EC25-2
EC17
EClO
EC07-2
No load
10 rnin.
2,000 rprn
I
No load
I
3,000
rprn
I
10
rnin.
I
~
No
load
60 rnin.
4,500 rprn
9.5 HP
5.5 HP
3.5 HP
2.3 HP
1.8 HP
3 0 min.
4,000 rprn
8.0
HP
5.0 HP
3.0
HP
2.0 HP
1.5
HP
10 rnin.
4.000 rprn
-
42
-

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ec07-2Ec10Ec17Ec25-2

Table of Contents