Sony DSC-W530 Service Manual page 12

Hide thumbs Also See for DSC-W530:
Table of Contents

Advertisement

6 Rotate the Naruto Gear and the lens is drawn out.
7 Pass the Flexible Board through the hole of the Fixed Stationary Tube.
Naruto Gear
8 Rotate the Naruto Gear and the lens is retractile.
9 Remove the Naruto Gear.
q; Remove the Fixed Stationary Tube Block.
qa Remove the 2 Group Assy.
Fixed Stationary Tube Block
DSC-W530_L2
Flexible Board
Fixed Stationary Tube
Naruto Gear
Lubricated Assy
2 Group Assy
qs Remove the 1 Group Assy.
qd Rotate (about 120 degree) Straight Tube Lubricated Assy and align the two points of ditches of the Straight Tube Lubricated Assy with
ditchies of the Cam Tube Block Assy, then remove the Straight Tube Lubricated Assy from the Cam Tube BlockAssy.
1 Group Assy
qf Pour a solvent such as alcohol from two places.
qg Remove while turning the Ornamental Ring A right and left.
qh Remove Barrier Assy by disengaging four claws.
A
Tweezers
Solvent
qj Remove the bond at the three points.
qk Rotate 1 Group Lens Assy and remove it from the 1 Group Frame.
Bond
1-9
Eyepiece Side View
Straight Tube
Lubricated Assy
Straight Tube
Lubricated Assy
Ditches
Cam Tube Block Assy
Ornamental Ring A
Claws
1 Group Lens Assy
1 Group Frame
120
Barrier Assy
Claws

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents