MSI MS-9297 User Manual page 27

1u rackmount server
Table of Contents

Advertisement

Step 4. Then push the DIMM n untl
its golden finger is deeply
nserted n the DIMM slot.
The slot clps at each sde of
the DIMM slot wll automat-
cally close when the DIMM
s properly seated.
Step 5. Follow the same procedures
to nstall more DIMMs f
necessary.
Step 6. Replace the fan duct on top of the CPU and DIMM.
Important
In Multi-Channel mode, make sure that you install memory modules of the
same type and density in different channel DIMM slots.
To enable successful system boot-up, always insert the memory modules into
the DIMM1 first.
You can barely see the golden finger if the memory module is properly inserted
in the DIMM slot.
MS-9297
MS-9297
2-9

Advertisement

Table of Contents
loading

Table of Contents