Mitsubishi Electric PV-S4200-IT Operating Manual page 47

Photovoltaic inverter
Table of Contents

Advertisement

Available languages

Available languages

The display item shown on the LCD screen will change each time the [SELECT] button is touched and released.
If, however, no button is pressed within 2 minutes, the display of the current operating status will be automatically
restored.
LCD-screen content for the following operations is actually shown reversed.
Display item
LCD screen
RUNNING
Present
ITA:ENEL GUIDE
Operating Status
TOTAL
OUTPUT
MAXIMUM 4508W
PRESENT
Present
Vdc1
Operation Data
Vdc2
Vac
lac
TOTAL
Total Accumulated
ENERGY
Data
HOURS
AMOUNT
DAY
1 Day's
ENERGY
Operation Data
HOURS
AMOUNT
YESTERDAY
MONTH
1 Month's
ENERGY
Operation Data
HOURS
AMOUNT
APR
YEAR
1 Year's
ENERGY
Operation Data
HOURS
AMOUNT
2010
SETUP
Setting Change
Screen
Touch and release
[SELECT] button
Displays the present operating status. (This display example shows that grid-connected operation is in progress.)
------------------------->
This display can also be used in modes other than RUNNING. For display descriptions, see [p.41 5.2.1].
------------>
Applicable Standards
11358kWh
-------->
Total generated energy
4321W
----------->
Present generated energy
----------->
Today's maximum generated energy
Touch and release the
[SELECT] button once.
------------------------->
Shows that the present operation data is displayed.
400.0V
----------->
Present PV voltage 1
380.0V
----------->
Present PV voltage 2
230.0V
----------->
Present grid voltage
18.8A
----------->
Present output current
Touch and release the
[SELECT] button once.
--------------------------->
Shows that the accumulated value is displayed.
11358kWh
-------->
Total generated energy
14002Hr
----------->
Cumulative operation time
5360EUR
---------->
Total amount of electric power sold
Touch and release the
[SELECT] button once.
10 MAY
-------->
Shows that today's cumulative value is displayed. (Display example: May 10)
23kWh
-------->
Today's generated energy
10Hr
----------->
Today's operation time
11EUR
--------->
Amount of electric power sold today
21kWh
-------->
Yesterday's generated energy
Touch and release the
[SELECT] button once.
MAY
-------->
Shows that this month's cumulative value is displayed. (Display example: May)
97kWh
-------->
This month's generated energy
129Hr
---------->
This month's operation time
129EUR
-------->
Amount of electric power sold this month
85kWh
-------->
Last month's generated energy
Touch and release the
[SELECT] button once.
2011
-------->
Shows that this year's cumulative value is displayed. (Display example: 2011)
3218kWh
-------->
This year's generated energy
3650Hr
----------->
This year's operation time
1397EUR
-------->
Amount of electric power sold this year
3302kWh
-------->
Last year's generated energy
Touch and release the
[SELECT] button once.
---------------------------> Shows that the «SETUP» screen for implementing setting changes is
displayed.
20 : 58 : 31
Touch and release the [ENTER] button to change the settings below.
10 MAY 2011
For the setting change method, see [p.46 5.4].
Touch and release
the [ENTER] button
Touch and release the [SELECT] button to return to the display screen
once.
for the present operating status.
To p.46
45
Description
Date and time, display language, unit price, address setting, AUTO
TEST and software version check

Advertisement

Chapters

Table of Contents
loading

This manual is also suitable for:

Pv-s4600-itPv-s6000-it

Table of Contents