DirecTV Advanced Installation Meter User Manual page 59

Advanced installation meter
Table of Contents

Advertisement

6 Performing Other Network Tests
Example: To test between the ODU and the
multiswitch, disconnect the cable connecting
the ODU to the multiswitch and connect it
to the AIM's ODU F connector. Then connect
the AIM's IRD F connector to the multiswitch.
Note: As messages are received from the
multiswitch (MSW) and BBC, the multiswitch
port and BBC frequency range flash bold. If no
messages are received, "N/A" appears.
5 Use
or
to highlight the location where you are testing.
6 Connect the AIM in series with the equipment at the location where you want to
test.
7 Press SELECT and wait briefly for the results of the test.
8 On the IN-LINE TEST RESULTS screen, review the results of the test. The screen
indicates whether the test passed or failed. The screen also shows:
– Voltage supplied (in volts).
– Current supplied (in milliamps).
– If present, amplitude of the 22 kHz tone.
– Indication as to whether DiSEqC commands are being received by the
multiswitch (MSW) and BBC.
9 Troubleshoot any problems following the instructions provided by DIRECTV.
10 Press DONE to return to the TEST screen.
AIM User's Manual
52

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents